Quick answer

Panel height affects visual privacy, supervision, daylight, acoustics, storage, power components, and the feel of density. Evaluate the whole workstation system and room—not a single height in isolation.

On this page8 sections

Before any physical work begins

Put the project boundary in writing. List what is included, what is excluded, who controls the building, who can approve changes, and what evidence will be accepted at completion. This prevents an apparently simple furniture task from absorbing undefined IT, trade, construction, cleaning, or disposal work.

Define the scope in layers

Use verified product and building dimensions. Nominal workstation sizes may omit panel thickness, connectors, storage, overhangs, power components, and shared-panel conditions that change the installed footprint.

Questions and evidence for each office furniture project scope layer
Scope layerQuestion to resolveEvidence to keep
FurnitureWhich exact items, quantities, and installed conditions are included?Inventory, photos, plan references
BuildingWhich access, protection, schedule, and insurance rules apply?Written building requirements
HandoffsWhich responsibilities belong to IT, electrical, security, or other trades?Named owner and completion check
OutcomeWhere does each asset group go, and what is the fallback?Destination and exception log

Use a project sequence, not a vendor assumption

The sequence below keeps discovery and responsibility assignment ahead of the physical work. Real projects may overlap stages, but each stage should still have an accountable owner and a clear completion signal.

A six-part project sequenceUse it to assign owners—not to skip local requirements.
  1. 01InventoryItems, condition, location
  2. 02AccessRoute, dock, elevator
  3. 03HandoffsIT, electrical, building
  4. 04Physical workStage, move, protect
  5. 05DestinationReuse, recover, dispose
  6. 06CloseoutInspect, document, accept

Questions the project brief should answer

  • What sightline is required?
  • How does the plan use daylight?
  • Are storage and overheads coordinated?
  • Will panel height affect infrastructure?

Record assumptions beside the answer. If a layout, item count, access window, buyer, or trade availability is unconfirmed, label it as an open issue instead of allowing it to become an invisible schedule dependency.

Coordinate with the building early

Coordinate circulation, access, egress, power, data, HVAC, sprinklers, lighting, and fixed building elements with the qualified professionals and authorities responsible for review. A furniture diagram is not a code approval.

Send the final requirements to every relevant party. A rule known by the office manager but not the crew—or a product constraint known by the installer but not the planner—does not reliably protect the project.

Define the outcome and closeout record

Judge the plan by how well it supports work, access, infrastructure, installation, and future change—not only by the number of workstations placed on the page.

At closeout, capture dated photos, exceptions, remaining items, damage, open punch work, destination records, and written acceptance where the project requires it. Keep the record with the inventory so the final state can be reconciled against the original scope.