Quick answer

Set the opening date, decide what moves, and give each workstream one owner. Then work backward through site readiness, furniture, IT, records, vendors, employee packing, labeling, move-day control, and day-one testing. Keep one live issue log and leave enough time after the physical move to fix missing, damaged, or misrouted items.

On this page9 sections

Make these six decisions first

  • Name the first day the new office must support normal work.
  • Choose what will move, stay, be replaced, go to storage, or leave the organization.
  • Appoint one move lead and one decision maker for urgent changes.
  • Confirm when both buildings, loading areas, and freight elevators are available.
  • Set the acceptable outage for phones, internet, shared systems, and critical teams.
  • Define completion: working seats, tested technology, accounted-for assets, cleared origin areas, and resolved exceptions.
Office furniture components organized on carts for a planned removal
Editorial illustration. A controlled removal starts with inventory, safe access, and a destination for each item. Actual products, building conditions, and project scope vary.

Decide what will actually move

Walk both sites before requesting a moving quote. At the old office, count furniture, packed contents, technology, records, appliances, artwork, plants, specialty equipment, and anything attached to the building. At the new office, match each moving item to a room, workstation, storage location, or named recipient. If the destination is blank, the item is not ready for a label. GSA's federal relocation category includes planning and reorganization as well as moving furniture and equipment, which is a useful reminder to define the full project before pricing transport. [1]

Give every asset group one clear disposition. Open table
Swipe to view all columns
Give every asset group one clear disposition.
Disposition Record before the move Owner
Move Origin, destination, quantity, label, handling note, and setup requirement Department or asset owner
Replace New-item delivery date, old-item exit date, and overlap plan Procurement and project lead
Store Storage address, term, access rules, inventory ID, and retrieval owner Facilities or records owner
Sell, donate, or recycle Accepted items, receiver, pickup terms, fallback, and required receipt Asset-disposition owner
Stay Reason, final location, handover responsibility, and clear label Origin-site owner

Treat IT equipment and storage media as a separate release. The IT owner should decide what can travel, who maintains custody, what needs a backup, and whether any device leaving service needs sanitization. NIST SP 800-88 Revision 2 frames sanitization around the sensitivity of the information and the controls chosen by the organization; a moving crew should not make that call at the loading dock. [2]

Build the timeline backward from day one

Project duration follows its dependencies. A small furnished suite may need weeks; a multi-floor move with construction, new furniture, and network changes may need months. Start with the longest constraint rather than a generic countdown. The table below is a planning sequence, not a promise of duration.

Office move timeline — set actual dates from your project constraints. Open table
Swipe to view all columns
Office move timeline — set actual dates from your project constraints.
Stage Finish before advancing Typical gate
Define Opening target, budget owner, headcount, move scope, lease milestones, and decision rights Leadership approves the brief
Design and procure Measured plans, seat plan, furniture decisions, technology design, vendor scopes, and long-lead orders Approved drawing and purchase releases
Prepare Construction, utilities, access, receiving, furniture installation, network, signage, and employee instructions New-site readiness review
Freeze Final roster, destination list, labels, move waves, contact sheet, outage window, and exception process Controlled move list issued
Execute Packing, protection, transport, placement, IT cutover, testing, and issue logging Move lead releases each wave
Stabilize Day-one support, missing-item search, corrections, asset reconciliation, origin closeout, and lessons learned Business and project owners accept completion

Protect the business, not only the truck schedule. Ready.gov recommends planning communications, IT recovery, and continuity together. For a planned move, turn that principle into a cutover plan: list critical services, the last safe shutdown time, the first required restore time, the test owner, and a fallback if the new site is not ready. [3]

Give every workstream one owner

A move stalls when several people can comment but nobody can release the next step. Name one accountable owner for each workstream. Specialists can advise and vendors can execute, but the owner closes decisions and keeps the master plan current.

Swipe to view all columns
Minimum ownership map for an office relocation.
Workstream Owner must control Proof it is ready
Move management Master schedule, issue log, vendors, approvals, and change control Current plan and contact sheet
People and communication Roster, seating notices, packing instructions, access, accommodations, and day-one help Audience-specific messages sent
Furniture and space Plans, inventory, labels, reuse, installation, removal, and punch items Room-by-room placement list
IT and security Devices, data, network, phones, access control, custody, backup, and tests Signed cutover and test results
Buildings Loading, elevators, work windows, protection, insurance, credentials, and walkthroughs Written approval from each property
Departments Special equipment, records, critical tasks, named exceptions, and local packing Department readiness sign-off

Send employees only what they need

  • Their new location and first reporting date
  • What to pack, what to leave, and what cannot go in a moving crate
  • Label format and packing deadline
  • Laptop, phone, badge, key, and personal-item instructions
  • Expected service interruption and approved work alternative
  • Where to report a missing item or day-one problem

Make both offices ready

Ask each property manager for the current move rules. One California public-building policy, for example, addresses reservations, mover identification, surface protection, egress, and insurance approval. It is a useful prompt, but only the rules for your two buildings settle your project. Book constrained resources before publishing the move date. [4]

Origin-site check

  • Loading area, freight elevator, carrying route, parking, security, and work window are confirmed.
  • Keep, move, dispose, and hold labels can be read without opening boxes.
  • Cabinets, drawers, appliances, and personal items have an emptying rule.
  • Powered, attached, heavy, confidential, or hazardous items have the right release owner.
  • Photos capture the condition of work areas and common routes before work starts.

Destination-site check

  • Construction, cleaning, life-safety work, utilities, access control, and furniture installation have cleared the move areas.
  • Room names, seat numbers, floor plans, door signs, and move labels agree.
  • Network, power, phones, printers, meeting rooms, and critical equipment have named test owners.
  • Receiving and staging space will not block occupied areas or required routes.
  • The day-one help point, spare equipment, supplies, and issue-routing process are ready.

Keep exit routes clear while packing, staging, and unpacking. OSHA requires exit routes to remain free and unobstructed. The site safety owner should translate that requirement, the building plan, and the crew's work method into controls for the actual move. [5]

Run move day from one control sheet

  1. Open both sites

    Confirm access, protection, elevators, loading, lighting, restrooms, staging areas, emergency contacts, and the first released rooms.

  2. Release one wave

    Use the controlled inventory and labels. Hold anything with a missing destination, damaged label, uncertain connection, or unapproved scope change.

  3. Track exceptions at once

    Record the item, location, photograph, issue, temporary action, decision owner, due time, and effect on later waves.

  4. Check placement by zone

    Compare delivered furniture, boxes, and equipment with the destination list before the crew leaves that zone.

  5. Test critical services

    IT and business owners run the agreed tests. A device sitting on the correct desk is not the same as a working service.

  6. Close the shift

    Inspect routes and work areas, secure keys and badges, reconcile missing items, preserve the issue log, and publish the next-day plan.

If the move crosses state lines or otherwise requires federal motor-carrier authority, check the carrier's current status and scope through the appropriate FMCSA records. The SAFER Company Snapshot is a free, current view of identification, operating information, and available safety data; it is one due-diligence step, not a substitute for contracts, insurance review, or state requirements. [6]

Test the new office before everyone arrives

Use a small advance team to test the experience from the front door to a working seat. Try badges, elevators, Wi-Fi, wired connections, phones, printing, room booking, video meetings, shared equipment, restrooms, wayfinding, deliveries, and help requests. Test the tasks people actually perform, not a green status light on a dashboard.

Close the move when these records agree

  • Seat roster and final furniture plan
  • Moved, stored, replaced, and disposed asset counts
  • IT cutover results and unresolved service issues
  • Damage, loss, correction, and claims log
  • Origin and destination walkthrough notes
  • Vendor completion records, invoices, and approved changes
  • Named owners and deadlines for every remaining issue

Frequently asked questions

How far in advance should an office move be planned?

Start when the opening date, lease obligations, design, technology, procurement, building access, and business-continuity decisions can still influence one another. Count backward from the longest dependency. A simple move and a multi-floor relocation should not share the same template duration.

Who should lead an office relocation?

Choose one accountable move lead with access to the project decision maker. Facilities often coordinates the work, while IT, HR, security, procurement, finance, department leaders, property managers, and vendors own defined parts of the plan.

What should employees pack themselves?

Give employees a short written rule based on the mover's scope, records policy, technology plan, and insurance terms. State what goes in crates, what travels with the employee, what stays connected, and what is prohibited.

Should an office move happen over a weekend?

Only if the business, buildings, vendors, and cutover plan support it. Weekend work can reduce disruption, but it can also add access limits, labor premiums, compressed testing, and fewer people available to resolve surprises.

What is the difference between an office move and decommissioning?

The move gets people, assets, and services working at the destination. Decommissioning returns the origin space under the lease and handover requirements. They share inventory and dates, but they need separate scopes, owners, acceptance tests, and budgets.

Sources, limits, and update policy

This checklist organizes a U.S. office move. It does not set a building rule, mover scope, carrier requirement, technology procedure, accessibility decision, insurance term, or site safety plan. Use the current contracts, property instructions, approved drawings, and responsible specialists for the project.

  1. U.S. General Services Administration: Multiple Award Schedule: Office Relocation and Reconfiguration (SIN 541614OR)
  2. National Institute of Standards and Technology: NIST SP 800-88 Revision 2: Guidelines for Media Sanitization
  3. Ready.gov: Emergency Plans for Business
  4. Judicial Council of California: Building Move Policy
  5. Occupational Safety and Health Administration: 29 CFR 1910.37: Maintenance, Safeguards, and Operational Features for Exit Routes
  6. Federal Motor Carrier Safety Administration: About the SAFER Company Snapshot